This well was built by Texaco in 1974, and produced hundreds of thousands of barrels of oil and water of formation before being "remediated" by Texaco in the mid-1990s. The results of this inspection were as follows:

  • Nickel, a carcinogen, was found in concentrations 75 times over the maximum allowable levels;
  • Lead was found in concentrations 19 times over the maximum allowable levels;
  • Chromium 6 was found at six times over the maximum allowable levels;
  • TPHs were found at four times the maximum allowable levels;
  • Copper was found at three times over the maximum allowable levels.